TA3D: Timing-Aware 3D IC Partitioning and Placement by Optimizing the Critical Path
By Donggyu Kim †, Minjae Kim ‡, Junseok Hur †, Jakang Lee †, Jinoh Cho † and Seokhyeong Kang †
† Department of Electrical Engineering, Pohang University of Science and Technology, Pohang, Republic of Korea
‡ Baum Design Systems Co., Seoul, Republic of Korea
In the face of challenges posed by semiconductor scaling, 3D integration technology has emerged as a crucial solution to overcome the constraints of traditional 2D Integrated Circuits (ICs). Recent advancements in 3D vertical interconnection technology have enabled 3D interconnections with reduced area overhead, potentially enhancing 3D IC performance in terms of timing, power, yield, and cost. However, despite the increased inter-die connection capacity enabled by fine-pitch 3D vias, research on 3D IC partitioning methods for timing improvement remains insufficient. This paper proposes a partitioning and placement method that optimizes the timing of 3D ICs by leveraging the increased inter-die connection capacity provided by fine pitch 3D vias. By using the Leiden algorithm and unsupervised GNN, we achieve optimal partitioning without relying on the results of 2D placement or additional training data. Our method employs balanced COP-KMeans to incorporate critical path optimization into partitioning, while ensuring balanced cell allocation across dies, thereby maximizing the area benefits of 3D ICs. Additionally, we optimize the timing of 3D ICs through 3D cell placement with critical net weight adjustments and a novel 3D via placement approach that differs from traditional 3D Half-Perimeter Wire Length (HPWL) optimization perspectives.
To read the full article, click here
Related Chiplet
- DPIQ Tx PICs
- IMDD Tx PICs
- Near-Packaged Optics (NPO) Chiplet Solution
- High Performance Droplet
- Interconnect Chiplet
Related Technical Papers
- Toward Digital Twins in 3D IC Packaging: A Critical Review of Physics, Data, and Hybrid Architectures
- 3D Stacked HBM and Compute Accelerators for LLM: Optimizing Thermal Management and Power Delivery Efficiency
- Optimizing Inter-chip Coupler Link Placement for Modular and Chiplet Quantum Systems
- 3D optoelectronics and co-packaged optics: when solving the wrong problems stalls deployment
Latest Technical Papers
- Affinity Tailor: Dynamic Locality-Aware Scheduling at Scale
- AMMA: A Multi-Chiplet Memory-Centric Architecture for Low-Latency 1M Context Attention Serving
- Exploring the Efficiency of 3D-Stacked AI Chip Architecture for LLM Inference with Voxel
- Epoxy Composites Reinforced with Long Al₂O₃ Nanowires for Enhanced Thermal Management in Advanced Semiconductor Packaging
- Chipmunq: A Fault-Tolerant Compiler for Chiplet Quantum Architectures